MetaWealth is developing BESS 3, its third 50 MW / 100 MWh battery park in Romania, developed from ready-to-build stage.
Developed ≈29% below the market benchmark
BESS 3’s total development cost is €200,000 per installed MWh. Aurora Energy Research puts a comparable project at €280,000 per MWh.
≈29% below benchmark
50 MW of installed power and 100 MWh of storage capacity, with Tier 1 LFP technology and liquid cooling.
50 MW / 100 MWh, Tier 1 LFP
Project acquired at RTB stage: land secured, grid access (ATR) issued, building permit in place, close to a grid operator node.
Grid access and permits in place, land secured
Day-ahead arbitrage, balancing services (aFRR), tolling and revenue floor agreements.
Arbitrage, balancing, tolling, minimum revenue
Estimated cost per MWh of installed capacity (50 MW / 100 MWh, €20m total cost). Benchmark source: Aurora Energy Research.

50 MW / 100 MWh · ready to build
BESS 3 stores energy when prices are low and delivers it to the grid when demand and prices are high. The project is being acquired at RTB (ready-to-build) stage, with the land secured, grid access (ATR) issued and the building permit in place. It sits close to a grid operator node, which lowers connection costs and risk.
Video · 4 minMichael Topolinski on energy infrastructure and BESS 3 development
Romania’s energy market
Battery storage earns from the gap between low-price and high-price hours. In Romania that gap is among the widest in the European Union, while installed storage remains well below what the grid needs.
Operational capacity on 1 September 2026, against the estimated need by 2030.
Sources: Bankwatch (Transelectrica data, Sep 2026) · Balkan Green Energy News (Transelectrica estimate for 2030)
Average daily 2-hour price spread (Jul 2025 – Jul 2026), the second highest in the EU
Source: SynerticsAverage 2-hour spread in August 2026, up 11% on August 2025
Calculated from OPCOM dataBattery storage operating in Europe at the end of 2025; installations up 48% year on year
Source: SolarPower EuropeModernisation Fund support scheme for storage, approved in March 2026
Source: European Commission, via ESS NewsThe BESS Romania programme
Dumbrava, Neamț
· €10m
Sânpaul, Mureș
Cetate, Dolj
Latest news
Flagship announcementNovember 26, 2026 · Romania Journal · 2 min readMetaWealth signs €10m deal for 100 MWh battery storage siteMetaWealth has signed a €10 million contract with StarCharge to supply batteries with a total capacity of 100 MWh for Sânpaul, the second project in its Romanian battery storage programme. The 48 MW / 100 MWh project in Mureș County is scheduled to begin commercial operation in Q3 2027.Read the article
More announcements
November 9, 2026 · Business Review · 3 min readMetaWealth secures third battery energy storage project in Dolj County, reaching 300 MWh
October 12, 2026 · Romania Insider · 1 min readParapet and MetaWealth break ground on a 50 MW / 100 MWh energy storage project in Neamț County
August 31, 2026 · Business Review · 3 min readMetaWealth completes first financial close for BESS 1



MetaWealth and InteRo Property Development operate as one family business group, combining investment management with development experience.
Partners of the MetaWealth platform








The MetaWealth team will walk you through the BESS 3 project and the BESS Romania programme.
Speak to our team